Quick facts
- What is included
- Shingles, flashing, pipe boots, vents, valleys, roof edges and the attic side where it can be reached.
- Typical time
- A roof inspection commonly takes under an hour, and the photo report is sent the same day.
- Who issues permits
- An inspection needs no permit. If work follows, the city or county office for your address is confirmed first.
- How pricing works
- The inspection is free. If the roof needs work, one written price follows and it holds for a year.
What does a free roof inspection in Medina cover?
The owner of Guttrz drives up from North Canton, about 45 minutes away, and does the inspection himself. He works through the same list on every house, whether it is a low ranch from the 1960s or a tall Victorian a block off Public Square.
- Shingle surface. Granule loss, curling, cracking, blistering and any shingles that have slipped or creased.
- Valleys. Where two slopes meet, water runs fastest and debris collects. He looks for worn shingles and exposed underlayment.
- Flashing. Step flashing at walls, the apron and counter flashing at the chimney, and the metal around any roof window.
- Pipe boots and vents. Rubber collars that have split, vent hoods gone to rust and fasteners backing out.
- Roof edges. Drip edge, the first course of shingles and the fascia board behind the gutter.
- Ridge and ventilation. Whether warm air has a way out at the peak and a way in at the soffits.
- The attic side. Dark stains on the decking, daylight at penetrations, damp insulation and frost on nail tips in cold weather.
- Layers. How many layers of shingles are on the house, checked at the roof edge.
That last item matters in Medina. The city's roof guidelines require a tear-off when a house already has two or more layers of any roof covering, so the layer count decides what kind of job is even allowed.
How do you read the Good, Watch or Replace Soon rating?
The last line of the report is a single rating. They are meant to be read in five seconds.
| Rating | What it means | What you do |
|---|---|---|
| Good | The shingles are flat and holding their granules, and the flashing is sound. | Nothing. Look again in a few years. |
| Watch | There is early wear or a small item, such as one cracked boot, that deserves attention. | Fix the small item and recheck in a year or two. |
| Replace Soon | Shingles, flashing or decking are near the end and patching will not buy much time. | Plan a replacement and get a written quote. |
A Watch rating is not a sales setup. Plenty of Medina roofs sit at Watch for years. The rating exists so you can budget without guessing.
What is in the photo report?
The report reaches you the same day. It holds the photos from the roof, each with a short caption that says what you are looking at and why it matters. A cracked boot gets a close-up. A worn valley gets a wide shot and a close one. If the attic was reachable, the underside of the deck is in there too.
It also notes the things a quote would depend on: rough roof size in squares, the pitch, the number of layers and anything unusual such as a roof window or a chimney on the low side of a slope. You can hand the report to any roofer. It is yours either way.
Book a free roof inspection in Medina
Pick a day that suits you and the owner comes to the house.
When should a Medina roof be inspected?
There is no bad month, but a few moments make more sense than others.
- When the house reaches its mid-twenties. Homes that went up in Medina during the 1990s building boom are at the age where the original shingles run out.
- Before you list or buy. A dated photo report answers the buyer's questions before the buyer asks.
- After you see granules in the downspout splash. A handful after a hard rain is normal on a new roof and a warning on an old one.
- Late fall. Medina has been a Tree City USA since 1981, and those street trees fill valleys every October. An inspection after leaf drop catches what the leaves were hiding.
- When a ceiling stain appears. That is no longer an inspection question. Go to roof repair in Medina.
What happens after the inspection?
If the roof is rated Good, nothing happens. You have a record and a baseline for next time. If it is rated Watch with a small defect, you get a fixed written price for that repair. If it is rated Replace Soon, you get one flat written quote for a full replacement, and the price is good for a year. The Medina roof replacement cost page explains what that number is built from.
There is no follow-up pressure. A quote written in December is the same in April. Installs start in spring 2027, so a winter inspection is how you hold a place without paying more for it. The full sequence, from first call to final photos, is laid out on the how it works page.
Do you inspect roofs outside the city?
Yes. Medina Township to the north and east and Montville Township to the south are both covered, and so is the rest of Medina County. See the areas page for notes on each.